Infrastructure

A production-ready zone with electricity, water, natural gas and road infrastructure.

9+1distribution centres (1 main)
24 hoursgrid monitoring via SCADA
5,000 m³water tank capacity
4.2 kmdistance to the water basin

Electricity

Active

Since obtaining its OSB Electricity Distribution Licence in 2024, the zone distributes electricity itself.

  • 1 main distribution centre and 9 distribution centres
  • Closed-ring network for uninterrupted power
  • Fully underground network serving each parcel individually
  • Network monitored around the clock via SCADA
  • Subscribers follow consumption in real time through the OSOS system

Water

Active

Service water comes from the intake structure in the Yanık Değirmen Burnaz water basin, 4.2 km from the zone.

  • 632 l/s of water taken from the basin is pumped into a 5,000 m³ tank
  • It is distributed from the tank to the factories in the zone
  • The whole system runs automatically through an automation system.

Natural Gas

Active
  • Our natural gas distribution has started at a capacity of 5,000 m³ and is available to all participants.
  • Consumption is monitored in real time with OSOS.